Product Description
Circuit Breakers Servicing,Testing & Commissioning
Offline Testing
- Insulation Resistance Measurement
- Dynamic Contact Resistance Measurement (DCRM)
- State Contact Resistance Measurement (CRM)
- Timing Measurement
- SF6 Gas Dew Point Measurement
- SF6 Gas Leakage Test
- Vacuum Interrupter Test ( VIDAR-only for VCB)
- Functional Check (Remote Trial)
Online Testing
Partial Discharge Measurement (For all Switchyard Equipment)
Thermography ( For All MV/EHV Equipments)
Circuit Breakers Servicing :
- Cleaning of breaker with CRC
- Removal of old grease and re-greasing the same with recommended grease.
- Check condition of arcing contact and gap between fixed and moving arcing contacts shall be checked.
- Checking the reset mechanism, tripping of breaker through push button
- Checking tripping of ACB through protection release
- Tripping of ACB manually through volt metric release.
- Checking and adjust freeness of DN and volt metric release trip rod
- Checking presence and proper tightening of hardware.
- Checking presence of all circlips
- Checking condition and alignment of jaw contact with cradle terminals
- Checking condition of ACB wiring and replace if required
- Checking and adjusting gap between hylam sheet and side plate
- Checking proper closing of all poles together
- Checking working of anti pumping device in case of EDO ACB
- Checking alignment of SIC and its operation
- Checking scrapping earth alignment
- Checking condition of arc chutes
- Checking U/V release pick up and drop off
- Checking ACB tripping through shunt release
- Checking motor operation in case of EDO ACB
- Checking closing coil operation in case of EDO ACB
- Checking continuity and proper changeover of aux contact block
- Checking of release by secondary injection for O/L, S/C, E/F
- Setting of release as per the load
- Checking the healthiness of CTs
- The spare parts, accessories would have to be provided by the customer.