Grid Code Compliance Renewables (EEG)
Requirements and Use Cases
The integration of decentral energy resources (e.g. photovoltaic systems, wind turbines, combined heat and power plants) into distribution networks is particularly occurring on medium and low voltage network levels. In the planning phase, many countries require that the connection conditions of these systems must be verified during the design phase based on procedures and criteria defined in national standards and guidelines. The large number of (often parallel) requests to a network operator requires their careful but rapid processing and documentation.
Solution
The verifying of the connection conditions as a module (EEG) in PSS®SINCAL offers a separate screen form for the individual steps of a connection check by the network operator. The user is guided step-by-step through the data input of the DER system, the selection of the process and analysis area and the definition of the respective limit values as well as the execution of the calculation and evaluation of the results.
PSS®SINCAL Massive and Parallelized Analysis Modules
Extend the core calculation modules to run massive and parallelized simulations over the whole network, and address many of the emerging analysis needs around renewables and e-mobility, from Contingency Analysis and Resupply, to Network Stress Test and Maximum Hosting Capacity.
To explore the comprehensive range of Siemens PSS SINCAL SIMULATION SOFTWARE click here!
|
|
![]() |
RELISERV SOLUTION
All Rights Reserved.(Terms of Use) Developed and Managed by Infocom Network Private Limited. |